11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
79
5. Check both ow control valves. Refer to
the ow control valve instructions in the
procedure for PLATFORM RAISES AND
LOWERS UNEVENLY.
4. Check for bent and broken parts on the
Liftgate that could interfere with normal
operation.
2. The “B” solenoid valve (FIGS. 74-1
and 74-2) may be stuck in the “open”
position. Remove the “B” solenoid
valve (FIG. 79-1). Next, check the
valve cartridge as follows. Push on
the plunger in the valve by inserting
small screwdriver in the open end (FIG.
79-2). If the plunger does not move
with a smooth, spring-loaded action
(approximately 1/8”), replace the valve
cartridge.
3. Reinstall “B” solenoid valve (if good) (FIG.
79-1) or a replacement. Torque valve
cartridge to 30 lbs.-ft. and hex nut to 30
lbs.-in.
Make sure Liftgate platform is open and resting on the ground before per-
forming the following step.
WARNING
!
To prevent damage when installing valve cartridges & coils, torque valve
cartridge nut to 30 lbs.-in. max.
CAUTION
TYPICAL SOLENOID VALVE
REMOVED & DISASSEMBLED
FIG. 79-1
COIL
VALVE
CARTRIDGE
NUT
CHECKING VALVE CARTRIDGE
FIG. 79-2
VALVE
CARTRIDGE
1/8”